Transmission tower at dusk over a distant city
Projects

Bridges we've built

Representative scenarios across the sectors we serve. Named case studies are on the way.

Data Centers

Bridging an 18-month interconnection gap for a hyperscale build

Challenge. A data center campus was construction-ready with racks staged, but the utility's permanent interconnection date was 18 months out.

Solution. Adera deployed MTS units sized to the first-phase load, staged at the site fence line and commissioned in under three weeks.

Outcome. The facility began accepting load on the construction schedule instead of the interconnection queue, with the bridge running until permanent service energized.

Manufacturing

Covering a planned substation outage without stopping production

Challenge. A manufacturing plant's utility substation required maintenance that would have meant a multi-day production shutdown.

Solution. A mobile substation was staged and connected ahead of the outage window under a short-term RaaS agreement, picking up the full plant load.

Outcome. Production continued through the entire maintenance window with zero unplanned downtime.

Renewables

Keeping a solar project generating while the interconnection queue cleared

Challenge. A completed solar array sat idle for months waiting on a delayed utility interconnection agreement.

Solution. Adera structured a DBOM arrangement to bridge the site to a temporary point of interconnection, sized and engineered to code.

Outcome. The project began generating and earning revenue months ahead of the permanent interconnection date.

Have a similar problem?

Tell us about your load, your timeline, and your site. We'll tell you how fast we can get power there.

Talk to us