From load assessment to energized power
Four steps, measured in weeks. Here's exactly what happens between your first call and your load picking up.
01
Assess the load
Adera's engineers scope voltage class, load profile, and timeline against what the utility can realistically deliver and by when.
02
Stage the bridge
MTS units or a purpose-built DBOM asset are engineered, tested, and mobilized to site ahead of the permanent interconnection date.
03
Energize
Adera crews handle connection, protection coordination, and commissioning, so the facility picks up load without a gap in service.
04
Hand off or hold on
When permanent utility service is ready, Adera demobilizes the bridge, or keeps operating the asset under a DBOM / EaaS contract for the long term.
Ready to start the clock?
The sooner we scope your load, the sooner we can tell you exactly how fast we can get power there.